#17 Link Support

 

Home
Up
What's New
Projects
Misc

Support Group

After I figured out how to get the brakes and hangers installed, I then began work on the link supports.  This took a lot of measuring and fine tuning to make sure all the dimensions were correct.  This piece holds together the swing link, crosshead slide and the front brake hangers.  I was thinking about having these parts cast, but decided to give it a go by machining the thing.   Here they are under construction ....

and mounted on the engine with the crosshead slide bars.. 

Just needs some final filing and a coat of paint.  I'll do that after I start work on the valve gear.

 Back Next

#01 So It Began #02 Frame #03 Drivers #04 Quartering #05 Trucks #06 Frame & Wheels #07 Side Rods #08 Cylinder Boring #09 Cyl/Valve Liners #10 Cyl/Valve Covers #11 Pistons & Valves #12 Cylinders Assembled #13 Boiler #14 Suspension #15 Crosshead #16 Brakes #17 Link Support #18 Bell #19 Crosshead (again) #20 Connecting Rod #21 Stationary Runner #22 Smokebox #23 Valve Gear #24 Running On Air #25 Piston Rings #26 Axle Pump #27 Plating #28 Lubrication - P1 #29 Blast Nozzle #30 Chimney #31 Steam Turret #32 Burner Manifold #33 Mounting Brackets #34 Boiler Insulation #35 Jacketing #36 Cab #37 Throttle #38 Reverse Lever #39 Track Test #40 Smokebox Access #41 Electric Blower #42 Turbulators #43 Burner Test #44 Piping #45 Cab #46 Tender #47

 

Home ] Up ] What's New ] Projects ] Misc ]

 

Send mail to webmaster@danslocoworks.com with questions or comments about this web site.
Copyright © 2007 Dan's Loco Works
Last modified: 02/29/08